our company is the production need, plans to invest prepares buys the following equipment:
1) domestically produced vertical processing center 12
2) import horizontal-type processing center 10
3) to import gear grinding machine 8
4) domestically produced gear-hobbing machine 12
5) boring lathe 4
6) the numerical control lathe 20
as well as the processing gear special purpose equipment one batch, asks each manufacturer to send the material before March 15, 2007 in me takes charge of.